Case Study · Production Alert Dashboard

AndonX

A real-time production alert dashboard for Strand Products’ shop and cleanroom floors — built to make one thing legible from across a room: a stalled workcenter that needs a response, now.

The AndonX TV dashboard mounted on a shop floor, showing an active alert: a 10-minute countdown timer, a magenta shop-floor zone tab, and the ALERTED status.

It sits on top of the same PLEX ERP data operators already used, and turns a flat, undifferentiated status picker into something readable on a 60-inch TV from across a shop floor — every active job tracked against a 10-minute initial-response goal, in three physical locations. This is my flagship case study: the one project among the set built with a real cross-functional team, a real client budget, and a real deadline — and it’s live in production today.

Role

UX Design & Research

Year

2025

Client

Strand Products

Scope

0 → 1, shipped

Status

Live · Beta (stalled)

56%
of tracked alerts acknowledged within the 10-minute goal
7 min
median initial response time — the exact metric it was built to move
3
60-inch TV dashboards, live across three physical locations
10 min
initial-response goal, built directly into the color of the timer

How this was built

A real team. A real budget. No AI in the build.

On my personal projects I direct an AI development partner through implementation. AndonX was different. It was a client engagement for Strand Products, designed and shipped by a small cross-functional team — a web developer, a principal stakeholder, and a full group of real users who weighed in before launch. That distinction is the point of including it: this is the project that shows I can collaborate on a shared, resourced, accountable build — not just direct a partner solo.

Team & Role

Designed alongside a real cross-functional team

I owned the UX — the research, the interaction model, and the visual system that made an urgent state legible from across a room. I worked day to day with the developer and the principal stakeholder, and the rest of the team shaped the tool through review before it went live.

Danielle Siano
UX Designer & Researcher — me
Nico del Castillo
Web Developer
Wes Prunckle
Principal Stakeholder
CER Leads · Shop & Production Leadership
Operational reviewers
Sustaining Engineers · Engineering Manager
Feasibility & data-model owners
Quality Inspectors
Original target users

The Product

In the order a supervisor would actually encounter it

AndonX doesn’t replace PLEX — it reads the same data and re-presents it for a glance-and-act decision. The screenshots below carry AndonX’s real, much bolder near-black / magenta / blue / amber brand. That jump in contrast from this page’s own quiet chrome is intentional: it’s the difference the design had to create.

The native PLEX Workcenter Status modal, a grid of nine flat status tiles all carrying equal visual weight.

Before · PLEX native

PLEX’s native ‘Workcenter Status’ picker: nine flat tiles, equal visual weight. ‘Idle’ and ‘Alerted’ read the same. Useless for a three-second decision across a room.

The core problem

Nine tiles, all shouting at the same volume

Operators had no fast way to flag a stalled workcenter to a supervisor. PLEX’s picker treated every status — ‘Idle’, ‘Production’, ‘Alerted’ — with identical weight. The design job wasn’t to redesign PLEX. It was to take that same data and make the most urgent state instantly obvious from a TV mounted across a floor.

After · The AndonX TV dashboard

The full ticket lifecycle, on the stage-black screen a supervisor reads across the room — from the alert firing to the response closing out.

AndonX TV dashboard in the Alerted state: a white 10-minute countdown timer, magenta shop-floor tab, the ALERTED label, and step one active on the tracker.

1 · Alerted

An alert fires. The 10-minute goal starts counting down in white, and step one of four goes active on the tracker.

AndonX TV dashboard in the Acknowledged state: white timer at five minutes, ACKNOWLEDGED label, one green check and a yellow droplet on the tracker.

2 · Acknowledged

Someone responds inside the goal. Step one gets a green check; step two becomes the active yellow droplet. The timer is still white — still safe.

AndonX TV dashboard in the Evaluated state: a red negative countdown, EVALUATED label, two green checks and a yellow droplet on step three.

3 · Evaluated

The issue is being assessed — and the clock has passed ten minutes, so the timer has turned red. The escalation is visible from across the room, no second glance.

AndonX TV dashboard in the Resolved state: three green checks, the RESOLVED label, and step four active on the tracker.

4 · Resolved

The response closes out. Three green checks, RESOLVED. Under the hood there’s no distinct ‘Resolved’ status — the ticket simply returns to Production.

The annotated AndonX design-decisions sheet, explaining the color, timer, and progress-tracker logic across states.

Design system · Annotated

The real annotated decision sheet: white timer turning red at 10 minutes, green check for a completed step, yellow droplet for the current one, and the timer pausing once a ticket is resolved.

Process · Decisions

Seven decisions, and why I made them

Not a generic process diagram — the real before/after moments that shaped the tool, including the honest engineering caveats I didn’t hide.

01
Scope discipline

Own one thing: initial response time

Before

Job tracking, history, reporting — all real, valid ideas the team wanted. Each one would have added a screen, a state, a reason to look twice.

After

We drew a hard boundary on day one. AndonX owns initial response time and nothing else. The other ideas were named and deliberately deferred, not dismissed — so they couldn’t dilute the one job the tool had to do well.

“A tool that tries to do everything is a tool nobody can read from across a room in three seconds.”

02
Legibility across a room

Turning a flat picker into an urgent, ranked system

Before

PLEX’s status modal gave ‘Idle’ and ‘Alerted’ the same visual weight — fine for a click, useless for a glance.

After

AndonX ranks by urgency in the design itself: the most urgent state is the biggest, boldest, most saturated thing on the screen, sized and colored to read from across a shop floor without anyone walking closer.

03
Color as mechanism

The 10-minute goal is built into the color itself

Before

A separate alarm or badge would mean a second glance — and a second thing to notice, miss, or ignore.

After

The timer stays white, then turns red at exactly the 10-minute response threshold. No separate alert. The color is the escalation — the single most-legible signal on the board.

“No second glance required. The color is the escalation mechanism.”

04
Lifecycle at a glance

A 4-step tracker for the whole ticket, not just its current state

Before

Showing only the current status tells you where a ticket is — but not how far it’s come or what’s left.

After

A row of four circles walks the full lifecycle — Alerted, Acknowledged, Evaluated, Resolved — with a green check for a completed step and a yellow droplet for the one in progress, readable at a glance. Honest data-model note: there’s no distinct ‘Resolved’ status underneath; a resolved ticket returns to Production. A real engineering constraint, surfaced rather than hidden.

05
Rollout

A real launch, not a quiet deploy

Before

A dashboard that appears on a wall one morning with no context is a dashboard people learn to ignore.

After

A dedicated Beta Launch workshop in November 2025, a full SOP with real state-by-state screenshots, and three standing support Slack channels — #andonx-errors, #andonx-general, #andonx-reporting — opened before launch and still active today.

06
Impact, honestly measured

The org restructured around what the tool surfaced

Before

The prior system had no alert states at all — so there’s no clean baseline to measure a before/after against.

After

56% of tracked alerts were acknowledged within the 10-minute goal, at a 7-minute median. The client’s own read was that the department shifted from a highly critical need to one running smoothly (his characterization, not a data-proven delta). And ownership of the response moved from QA to engineering, who relocated a dedicated person into the cleanroom.

“The org restructuring around what the tool surfaced is its own kind of validation.”

07
What I’d do differently

The baseline I never captured, and the team I met too late

Before

The developer and I worked closely with the CEO for most of the project, largely apart from the broader team. And I never paused to document baseline response times before building.

After

So the tool’s real impact rests on the client’s word rather than data I can point to independently. And once the wider team engaged post-launch, better operational solutions surfaced fast — a good outcome that would have made a stronger tool if that group had been in the room from day one.

Impact

The exact metric it was built to move

56%
of tracked alerts acknowledged within the 10-minute goal
7 min
median initial response time across tracked alerts
QA → Eng
response ownership shifted; engineering moved a dedicated person into the cleanroom
Client characterization — labeled as such

The client’s own read was that the department went from a highly critical need to one running smoothly. I’m stating that as his characterization, not a data-proven before/after — the alert states didn’t exist under the prior system, so there is no baseline to prove it against.

Organizational outcome

The tool surfaced the response gap clearly enough that the org restructured around it: ownership moved from the original target users in QA to engineering, who relocated a dedicated person into the cleanroom to hold it.

The research that led to AndonX · Production & QA response workflow

The Strand Products production and QA response workflow diagram used in the AndonX rollout.

What’s next & what I’d do differently

Honest about where it stands

AndonX launched through a real workshop in November 2025 and is live and adopted today — but it never advanced past that initial beta. Funding was pulled shortly after launch, and the company has no current plans to invest further, despite the tool being underused relative to what it could still show a team like this. I’d rather say that plainly than imply an ongoing, fully-realized product.

Lesson one

Capture the baseline before you build

I never documented baseline response times or collected explicit before/after statements from the team up front — so the real impact today rests on the client’s word rather than data I could point to independently.

Lesson two

Get the whole team in the room sooner

We worked mostly with the CEO, apart from the broader team. Once the rest of the group got involved post-launch, better operational solutions surfaced fast — which would have shaped a stronger tool from day one.

What this demonstrates

Capabilities I bring to any team

AndonX is one project, but the practice behind it travels — it’s how I approach collaboration, constraint, and craft on anything with real stakes and real people around the table.

Real cross-functional collaboration

Designing alongside a developer and a principal stakeholder, with a full team of real users whose feedback shaped the outcome.

Designing for a shared, glance-based environment

A TV read from across a room, not a screen in someone’s hand — legibility, scale, and hierarchy as the whole job.

Translating a legacy enterprise system

Turning PLEX’s raw status data into something actionable without redesigning the system underneath it.

Deliberate scope discipline

Protecting a tool’s core job from feature creep, even when more was clearly possible.

Honest handling of constraints & data

Measuring real impact carefully, naming what wasn’t proven, and being direct about what a funding cut actually stopped.

Influencing organizational behavior

The tool surfaced a problem clearly enough that the client’s team restructured around it.